Common questions
No. Structural review becomes more important when the roof work includes deteriorated deck replacement, altered openings, parapet repairs, new rooftop loads, or other changed support conditions.
Once skylights, curbs, hatches, ducts, drains, or other penetrations interrupt existing framing or require new support members, the project usually needs more explicit structural coordination.
Yes. Roof-edge details often overlap parapet condition, coping support, and attached roof-access or railing items that cannot be isolated from the roof scope.
Start with the 2022 Construction Codes, DOB NOW: Build, the DOB NOW Public Portal, and DOB's parapet guidance when roof-edge conditions are involved.
Need project-specific help?
Use the consultation page when the roof package includes openings, parapet work, deck deterioration, or rooftop support changes.
Open the consultation page