Common questions
Many do. The exact filing path depends on scope, but elevator work often moves through DOB permit and DOB NOW resource paths when installation, alteration, or building-side modification is involved.
No. Existing geometry, pit depth, overhead clearances, support reactions, and undocumented field conditions can all affect whether reuse is feasible without added structural work.
Structural review becomes more important when equipment changes support reactions, the shaft geometry changes, the pit is deepened, or the receiving structure needs confirmation.
Existing drawings, photos, the intended scope, any filing status information, and notes on whether the building is occupied or has a usable existing shaft.
Need project-specific elevator advice?
Use the dedicated elevator consultation page to organize the building-side questions before the scope hardens.
Open the consultation page